|
|
|---|
|
Daily, weekly and annual timetables can be looped
○ Tick the checkbox «Loop the list» If the timetable is weekly, then Monday will follow right after Sunday in the list ○ Specify how many top rows of the table should not take part in the loop. It is recommended to set the same number as pinned in the table header |
|
« Previous info.paperup.ru Next » |
|---|